From Custom Power Spring Sample Approval to Production: What Should Buyers Confirm?

A custom power spring fits the reel and passes the agreed rewind check. During sampling, the end hook was revised to fit the reel’s mounting slot. The buyer approves the revised sample, but the first production purchase order still refers to the original drawing.
Both teams may say “the sample is approved” while working from different revisions. Before releasing the order, link the approved sample, the governing drawing, the acceptance requirements and the first production PO.
1. Identify the sample that passed
Record the sample ID or batch reference, the approval date and the drawing revision represented by that sample. If several versions were trialled, a photo of the approved end hook can help the buyer and the spring manufacturer identify the same part. Keep that photo with the approval record.
If approval came from an assembly trial, record which reel configuration was used and what was accepted. For example, did the trial confirm that the end hook seated correctly, that the reel completed the agreed rewind check, or both?
2. Confirm the drawing that governs production
Put the agreed drawing number and revision on the purchase order or in a document referenced by it. If the approved sample differs from the drawing, document the difference and agree how it will be handled before releasing the order. If that difference is intended for production, make sure it is reflected in the agreed production documents.
For the revised end hook in this example, can purchasing, engineering and the supplier all open the same drawing and point to the same hook detail? For more on how the hook fits the reel, see power spring end connections.
3. Agree what the first production lot must demonstrate
Review which sample checks carry forward to the first production lot. Depending on the project, those might include the end-hook geometry, fit in the reel or an agreed torque check. Confirm who performs each check and what records the buyer expects.
If the spring manufacturer checks torque on a fixture and the buyer checks rewind in the assembled reel, record both checks separately. They answer different acceptance questions. For more on defining test conditions and reviewing results, see spring testing and acceptance.
4. Link the first production order to the approved revision
Before releasing the PO, ask the supplier to acknowledge the part number, drawing revision, approved sample reference and first-lot requirements. If parts or work in progress already exist from an earlier revision, agree how they will be identified and handled before shipment.
Illustrative release note: Manufacture to drawing Rev B, as represented by approved sample S-02. Confirm the revised end-hook detail and provide the agreed first-lot inspection records with the initial shipment.
If sample approval is still pending, confirm the sample scope and timing before setting a production release date. See custom spring sample lead time.
