How are spring testing, cycle life and certification handled?

Zongda spring torque testing machine with its sample fixture.
Zongda torque testing machine and sample fixture, photographed in the factory.

Custom power spring and constant force spring testing must use agreed operating conditions and acceptance criteria. Spring cycle life depends on the specific material, dimensions, working turns or linear travel, end design, speed, environment and assembly. A flat spring life claim therefore needs a defined test setup and supporting results.

Testing

Applicable in-house checks include dimensional, hardness, torque and fatigue testing. Salt-spray testing is arranged through a qualified third-party laboratory. The exact equipment range, test standard, sample count, operating conditions and acceptance criteria are confirmed for each project.

What Should a Custom Spring Test Report Include?

Agree on four points before testing: which samples will be tested, how the test will run, what criteria apply and what decision the results will support.

Flat coil power spring beside a blank sample inspection checklist.
Illustration of a custom spring sample inspection checklist.

Identify the samples and drawing revision

Record the part number, drawing revision, sample or batch identifier, quantity tested and test date. If a revision changes the end connection, mounting orientation or working travel, agree which checks need to be repeated.

Record the setup and measurement points

Describe the fixture or complete assembly, installed position and working range. For a flat coil power spring in a rewind reel, record the winding direction, starting position and points at which torque is measured. For a constant force spring, record the pull direction and the travel positions where force is measured.

Agree on acceptance criteria before testing

For each check, agree on the method, unit, acceptable limits and how the result will be judged. For a cycle test, define the motion, load, planned cycle count, failure criteria and checks to make afterward.

Depending on the material, spring design and operating conditions, some Zongda custom springs can reach 20,000 cycles under agreed test conditions. Record the planned and completed counts, working travel, load, acceptance criteria and sample condition at the end of the test.

Show results, deviations and the next decision

Put the measured values alongside the agreed criteria. A results table can record the sample ID, test item, condition or measurement position, acceptance criterion, measured result and disposition. Document any deviations and state whether the results support assembly trials, a sample revision or a repeat check.

Before sending samples for testing

Share the latest drawing and application details, identify what the sample must demonstrate and agree on the evidence the approval team needs. For a rewind reel, specify a bench torque check and an assembled reel return check separately when both are needed.

Quality certification

Ningbo Zongda Electrical Appliance Spring Co., Ltd. holds an ISO 9001:2015 quality management system certificate. The ISO 9001:2015 certificate covers design and production of coil springs with torque ≤30 Nm. The ISO 14001:2015 and ISO 45001:2018 certificates cover environmental and occupational health and safety management activities related to design and production of power springs (coiled springs) with torque ≤100 Nm. The ISO 9001 certificate is valid until 18 September 2028; the ISO 14001 and ISO 45001 certificates are valid until 14 September 2029, subject to the required annual surveillance audits. These scopes do not mean that every product or customer requirement is automatically certified.

Automotive-related projects can be reviewed against the customer’s specific product requirements and supplier-audit process. Any customer-specific approval, test or compliance request should be discussed before quotation so the responsible requirements can be confirmed.

Similar Posts