How to Read a Power Spring Drawing Before Approving Samples
Before approving custom power spring samples, check what each drawing view and dimension actually describes. Strip thickness, spring diameter and housing inside diameter refer to different features. Reading one as another can lead to a sample that appears correct but does not fit the assembly.
This guide explains the main items to check on a flat coil spring drawing: drawing revision, strip dimensions, diameters, end connections and performance requirements.

The accompanying illustration uses these example values:
| Item | Illustrative value |
|---|---|
| Strip thickness, t | 0.50 ± 0.02 mm |
| Strip width, b | 24 mm |
| Housing inside diameter | Ø150 mm |
| Indicated end bend radius | R2 mm |
These dimensions are for explanation only. They do not form a complete spring specification and must not be used for manufacture.
1. Start with the Drawing Revision and Status
Before checking dimensions, confirm that both parties are reviewing the same drawing.
Check the drawing number, revision, units and sheet count. Also confirm whether the document is a quotation drawing, a sample approval drawing or an approved production drawing.
A revised end hook or updated dimension may be small on paper but affect assembly. If a quotation refers to one revision and the sample approval refers to another, resolve that difference before proceeding.
When reviewing a multi-sheet power spring drawing, include the notes and detail views on the remaining sheets.
2. Separate Strip Thickness, Width and Length
A power spring is formed from steel strip. Its thickness, width and developed length describe three different dimensions.
In the illustration, the rectangular strip section shows:
- Thickness, t: 0.50 ± 0.02 mm.
- Width, b: 24 mm.
The thickness tolerance gives an allowable range of 0.48–0.52 mm. It applies to strip thickness—not to the overall spring diameter.
The 24 mm width is shown without an individual tolerance in this educational illustration. On an actual manufacturing drawing, check whether a general tolerance applies or whether a separate width tolerance needs to be specified.
Developed length is the length along the steel strip when considered uncoiled. It is not the diameter of the wound spring. Where a break symbol shortens a long strip view, read the stated dimension rather than measuring the drawing.
3. Check What Each Diameter Refers To
The symbol Ø means diameter. ID means inside diameter, while OD means outside diameter.
In the illustration, Housing ID: Ø150 mm describes the inside diameter of the housing. The dashed circle represents that housing reference. It does not specify the free outside diameter of the spring.
A flat coil spring drawing may separately identify the housing inside diameter, shaft diameter and spring diameter in a stated condition. These dimensions must not be treated as interchangeable.
For any spring diameter, check whether it is measured in the free state, under restraint or after installation. If the drawing does not make the condition clear, ask for clarification before judging the sample.
4. Read the End Connections and Radius Callouts
The inner and outer ends connect the power spring to the mating parts. Check their shape, orientation and engagement with the shaft, slot, pin or housing feature shown in the assembly.
In the illustration, R2 identifies a 2 mm radius at the bend indicated by the leader arrow. It does not mean that every bend on the spring has the same radius.
Where a drawing includes an enlarged detail view, use it to check the local hook geometry. A general front view may not show enough information to define an end connection.
If winding direction is specified, also check the viewing direction. “Clockwise” is incomplete unless both parties understand which side the spring is viewed from and what movement is being described.
5. Read Torque and Turns with Their Test Conditions
A dimensional drawing does not automatically define the performance acceptance criteria for a custom power spring.
If a drawing includes a torque table, check:
- The torque unit, such as N·mm, N·cm or N·m.
- The reference position from which turns are counted.
- Whether the reading is taken during winding or unwinding.
- The specified measurement positions and acceptance limits.
- The mounting and test conditions.
For example, a requirement stated “at 3 turns” is incomplete unless the starting position is defined. Also distinguish a target value from an allowable range and from a recorded test result.
The illustration in this article contains no torque or working-turn requirement. Its spiral lines show the spring schematically; counting the visible turns does not establish its usable operating turns.
6. Read Material, Notes and Approval Requirements
After reviewing the views and dimensions, read the material specification and technical notes.
Depending on the project, these may cover material grade and delivery condition, edge condition, surface requirements, lubrication, marking or inspection requirements. A note stating that a material is “proposed” or “subject to approval” should not be read as a final agreement.
If you have your own inspection specification or test procedure, send the document to ZongDa with the drawing. We can review the requirements and confirm the applicable test arrangements, acceptance criteria and reporting needs before testing.
The educational illustration does not specify material, heat treatment, lubrication or fatigue life. These items must be agreed separately for an actual sample project.
Before You Approve the Samples
Read a power spring drawing in this order:
Revision and status → strip dimensions → diameters and measurement conditions → end connections → performance requirements → technical notes.
If a dimension or test condition is missing, identify it before sample approval. A clear drawing gives the customer and spring manufacturer a shared reference for what will be made, how it will fit and how it will be checked.
For a custom flat coil spring enquiry, send the latest drawing together with the available mating-part information and inspection requirements. ZongDa can review the documents and clarify the items that still need confirmation.

One Comment
Comments are closed.